
From Blade to Site: How a Wind Energy Giant Synchronized Global Operations and Slashed Logistics Costs
When planning for mold capacity, blade manufacturing, and site installation are disconnected, the results are spiraling costs and missed opportunities. Discover how this global leader moved beyond siloed Excel sheets to build a Digital Twin of their entire network—enabling real-time visibility, automated what-if scenarios, and a faster response to market shifts that drove increased market share.
The company was facing fundamental supply chain shifts with increasing numbers of complex configurations in the product portfolio and a rapidly growing customer base.
In addition to that, the planning process for mold capacity planning, blade manufacturing, blade transportation, and blade installation at customer sites was disconnected, leading to cost and inventory issues.
Sustainability impact
Reduction of inventory and reduction of logistics expedites.
Complexity to Clarity
The Wind Turbine division lacked visibility of constraints and cost from mold capacity planning, all the way to installation at customer sites.
With o9, the company will get a digital twin providing visibility to demand (pipeline of opportunities), transportation, blade manufacturing, and mold manufacturing capacities and costs.
Value Delivery
Systems Replaced
- Excel
Key Functionalities Implemented
The Wind Turbine division is using the Enterprise Knowledge Graph to enable end-to-end planning, including demand, supply, transportation, and IBP. Key capabilities enabled include: what-if scenarios, trade-off evaluation in both units and currency, demand/supply balancing, incremental and interactive planning, and a digital twin that provides end-to-end visibility on cost and capacities across the entire network.
Customer Benefits
success factors
- o9’s platform enables real-time demand/supply synchronization, scenario planning capabilities, and the digital twin of the entire network.
- o9’s expertise and thought leadership in the renewable energy space.
- Rapid and agile deployment methodology.
KPI Impacted
- Improved market share via quicker response to demand or supply changes.
- Improved forecast accuracy.
- Reduced expedited logistics costs.
Experience the power
of o9 first-hand

Take a Tour

