/

/

Data Requirements

The footage
already exists.

Every decision your team has made is already captured. A few core files is all it takes to start the replay. Share more and the analysis goes deeper — but you are never waiting on perfect data to begin.

“How accurate was your forecast — and where did it break down?”

Mandatory
Required to run the analysis
  • Item Master

    Core item identifiers and richer product attributes used to slice results consistently across forecast, inventory, and service analysis.

    • Item
    • Item Description
    • Category
    • Brand
    • UOM
    • Item Type
    • Item Status
  • Site / Location

    Defines the sites or locations used in the forecast and actuals data, enabling site- and region-level review and serving as the location foundation for downstream PGAs.

    • Site
    • Site Type
    • Region / State
  • Sales / Shipment Actuals

    Actual sales or shipment history — the "what really happened" side that the forecast is measured against.

    • Item
    • Site
    • Customer (Optional)
    • Date
    • Actual Qty
  • Consensus Forecast

    The forecast produced by your planning team — the baseline we evaluate. Customer is only needed if forecasting at the customer level. Typically includes Lag and Planning Cycle for lag-based accuracy analysis.

    • Planning Cycle
    • Item
    • Site
    • Customer (Optional)
    • Forecast Date
    • Lag
    • Forecast Qty
Optional
Unlocks deeper insight
  • Customer Data

    Enables account- and channel-level accuracy breakdowns.

    • Customer
    • Customer Description
    • Channel
  • Promotions & Events

    Supports causal review of forecast spikes and misses tied to trade activity.

    • Event ID
    • Event Type
    • Item
    • Customer
    • Start Date
    • End Date
weekly example

Planning Cycle vs Lag

Historical forecast can be handed over in either of two shapes — organized by planning cycle or organized by lag. They hold the same numbers, so send whichever your system supports.

by planning cycle

A planning cycle is a frozen copy of the whole forecast as it stood on the week it was generated, built on the actuals known up to that point. Every cycle adds another copy — one cycle, one row.

week 1Monday, Jan 5
week 2Monday, Jan 12
week 3Monday, Jan 19
week 4Monday, Jan 26
week 5Monday, Feb 2
week 6Monday, Feb 9
week 7Monday, Feb 16
Planning Cycle Week 2Name = PC-W02
ACTUAL
100
lag 0
current week
116
lag 1
99
lag 2
138
LAG 3
150
Planning Cycle Week 3Name = PC-W03
ACTUAL
100
ACTUAL
118
lag 0
current week
101
lag 1
128
lag 2
110
lag 3
125
Planning Cycle Week 4Name = PC-W04
actual
100
actual
118
actual
96
lag 0
current week
126
lag 1
106
lag 2
118
lag 3
135
ACTUALSWhat really shipped
actual
100
actual
118
actual
96
actual
130
actual
104
actual
112
actual
121
by lag

A lag is the distance between the cycle forecast came from and the week it describes: Lag 1 is one week ahead, Lag 3 is three weeks ahead. It answers how early did we say it. Take one lag from every cycle and it straightens into a continuous series that lines up against actuals week by week — each lag is scored on its own.

week 1Monday, Jan 5
week 2Monday, Jan 12
week 3Monday, Jan 19
week 4Monday, Jan 26
week 5Monday, Feb 2
week 6Monday, Feb 9
week 7Monday, Feb 16
lag 0 seriesCurrent week
pc-wo2
116
pc-wo3
101
pc-wo4
126
lag 1 seriesOne week ahead
pc-wo2
99
pc-wo3
128
pc-wo4
106
lag 2 seriesTwo weeks ahead
pc-wo2
138
pc-wo3
110
pc-wo4
118
ACTUALSWhat really shipped
actual
100
actual
118
actual
96
actual
130
actual
104
actual
112
actual
121

Before you export: Please confirm whether your system treats the current week as Lag 0 or Lag 1.

Overlap Weeks where a plan and an actual both exist — the only window where accuracy can be calculated. Minimum 3 periods, 6+ preferred.