The footage
already exists.
Every decision your team has made is already captured. A few core files is all it takes to start the replay. Share more and the analysis goes deeper — but you are never waiting on perfect data to begin.
“How accurate was your forecast — and where did it break down?”
Item Master
Core item identifiers and richer product attributes used to slice results consistently across forecast, inventory, and service analysis.
- Item
- Item Description
- Category
- Brand
- UOM
- Item Type
- Item Status
Site / Location
Defines the sites or locations used in the forecast and actuals data, enabling site- and region-level review and serving as the location foundation for downstream PGAs.
- Site
- Site Type
- Region / State
Sales / Shipment Actuals
Actual sales or shipment history — the "what really happened" side that the forecast is measured against.
- Item
- Site
- Customer (Optional)
- Date
- Actual Qty
Consensus Forecast
The forecast produced by your planning team — the baseline we evaluate. Customer is only needed if forecasting at the customer level. Typically includes Lag and Planning Cycle for lag-based accuracy analysis.
- Planning Cycle
- Item
- Site
- Customer (Optional)
- Forecast Date
- Lag
- Forecast Qty
Customer Data
Enables account- and channel-level accuracy breakdowns.
- Customer
- Customer Description
- Channel
Promotions & Events
Supports causal review of forecast spikes and misses tied to trade activity.
- Event ID
- Event Type
- Item
- Customer
- Start Date
- End Date
Planning Cycle vs Lag
Historical forecast can be handed over in either of two shapes — organized by planning cycle or organized by lag. They hold the same numbers, so send whichever your system supports.
A planning cycle is a frozen copy of the whole forecast as it stood on the week it was generated, built on the actuals known up to that point. Every cycle adds another copy — one cycle, one row.
week 1Monday, Jan 5 | week 2Monday, Jan 12 | week 3Monday, Jan 19 | week 4Monday, Jan 26 | week 5Monday, Feb 2 | week 6Monday, Feb 9 | week 7Monday, Feb 16 | |
|---|---|---|---|---|---|---|---|
Planning Cycle Week 2Name = PC-W02 | ACTUAL 100 | lag 0 116current week | lag 1 99 | lag 2 138 | LAG 3 150 | ||
Planning Cycle Week 3Name = PC-W03 | ACTUAL 100 | ACTUAL 118 | lag 0 101current week | lag 1 128 | lag 2 110 | lag 3 125 | |
Planning Cycle Week 4Name = PC-W04 | actual 100 | actual 118 | actual 96 | lag 0 126current week | lag 1 106 | lag 2 118 | lag 3 135 |
ACTUALSWhat really shipped | actual 100 | actual 118 | actual 96 | actual 130 | actual 104 | actual 112 | actual 121 |
A lag is the distance between the cycle forecast came from and the week it describes: Lag 1 is one week ahead, Lag 3 is three weeks ahead. It answers how early did we say it. Take one lag from every cycle and it straightens into a continuous series that lines up against actuals week by week — each lag is scored on its own.
week 1Monday, Jan 5 | week 2Monday, Jan 12 | week 3Monday, Jan 19 | week 4Monday, Jan 26 | week 5Monday, Feb 2 | week 6Monday, Feb 9 | week 7Monday, Feb 16 | |
|---|---|---|---|---|---|---|---|
lag 0 seriesCurrent week | pc-wo2 116 | pc-wo3 101 | pc-wo4 126 | ||||
lag 1 seriesOne week ahead | pc-wo2 99 | pc-wo3 128 | pc-wo4 106 | ||||
lag 2 seriesTwo weeks ahead | pc-wo2 138 | pc-wo3 110 | pc-wo4 118 | ||||
ACTUALSWhat really shipped | actual 100 | actual 118 | actual 96 | actual 130 | actual 104 | actual 112 | actual 121 |
Before you export: Please confirm whether your system treats the current week as Lag 0 or Lag 1.
Overlap Weeks where a plan and an actual both exist — the only window where accuracy can be calculated. Minimum 3 periods, 6+ preferred.